The Technology/Standard List identifies technologies and technical standards that have been assessed.
Each project team must consult the organizations responsible for the target development, desktop, testing and/or
production environments to ensure that the intended use of the technologies is supported.
(More info on proper use)
List of Technologies/Standards
Adobe Creative Cloud Desktop Application
|
Adobe |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/02/2025 at 19:25:02 UTC |
Agent Ransack
|
Mythicsoft |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/03/2025 at 15:03:38 UTC |
AlphaCard ID Suite
|
AlphaCard |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/06/2025 at 16:59:04 UTC |
Altair Monarch Server
|
Altair |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/08/2025 at 18:20:25 UTC |
American Dynamics Software Development Kit (SDK)
|
American Dynamics |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/03/2025 at 16:17:49 UTC |
Apache Struts
|
Apache Software Foundation (ASF) |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/06/2025 at 16:59:01 UTC |
Appian Business Process Management Suite (BPMS)
|
Appian |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/07/2025 at 01:25:07 UTC |
Ascent Compass
|
Honeywell |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/07/2025 at 01:24:51 UTC |
Astera ReportMiner
|
Astera |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/06/2025 at 02:05:01 UTC |
AutoDesk 3ds Max
|
Autodesk, Inc. |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/06/2025 at 02:04:58 UTC |
Automated Method for Testing Auditory Sensitivity (AMTAS) Pro
|
Grason-Stadler |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/02/2025 at 15:43:47 UTC |
Azure DevOps Office Integration
|
Microsoft |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/08/2025 at 18:20:25 UTC |
BioAdaptor
|
Cyber Armed |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/03/2025 at 16:17:50 UTC |
Bodyswaps
|
Bodyswaps |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/08/2025 at 18:20:26 UTC |
Calabrio Workforce Management Software (WFM)
|
Calabrio, Inc. |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/08/2025 at 18:20:26 UTC |
Canva for Desktop
|
Canva |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/02/2025 at 19:25:03 UTC |
Care Transitions Portal
|
Engineered Care, Inc. |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/07/2025 at 01:24:53 UTC |
CenTrak Connect Core
|
CenTrak |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/07/2025 at 01:24:54 UTC |
ChromeDriver
|
Deque Systems |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/07/2025 at 01:24:54 UTC |
Claims Administration and Management System (eCAMS) Health Care Engine (HCE)
|
Acentra Health |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/07/2025 at 01:24:55 UTC |
Claims Administration and Management System (eCAMS) RuleIT
|
Acentra Health |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/07/2025 at 01:24:56 UTC |
ClaimStaker
|
Aptarro |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/02/2025 at 19:25:00 UTC |
ClaimsXten
|
Change Healthcare |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/07/2025 at 01:24:56 UTC |
ClickOnce Bootstrapper
|
Microsoft |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/06/2025 at 16:59:01 UTC |
CodeWizard
|
Aptarro |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/02/2025 at 19:25:00 UTC |
Colorspace Transformations
|
MathWorks |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/07/2025 at 01:24:57 UTC |
Colour Contrast Analyser based on Electron (CCAe)
|
Paciello Group |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/08/2025 at 18:20:26 UTC |
Command 360
|
Haivision |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/06/2025 at 16:59:02 UTC |
Computrition Hospitality Suite Xchange Gateway
|
Computrition |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/06/2025 at 16:59:02 UTC |
Connex Electronic Vitals Documentation (EVD)
|
Hill-Rom |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/07/2025 at 01:24:57 UTC |
Customer Information Control System (CICS)/Morning News
|
MacKinney Systems, Inc. |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/08/2025 at 18:20:27 UTC |
DataPower Gateway
|
International Business Machines (IBM) |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/07/2025 at 01:24:58 UTC |
Db2
|
International Business Machines (IBM) |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/06/2025 at 02:04:58 UTC |
Dell SupportAssist
|
Dell |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/08/2025 at 18:20:27 UTC |
DesignPro Tools
|
Xerox |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/02/2025 at 15:06:26 UTC |
DFexplore
|
DFnet |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/02/2025 at 19:25:00 UTC |
DotNetNuke (DNN)
|
DotNetNuke Corp. |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/06/2025 at 02:04:59 UTC |
Dragon Software Developer Kit (SDK)
|
Nuance |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/07/2025 at 01:24:58 UTC |
Dynatrace Managed
|
DynaTrace |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/02/2025 at 19:25:03 UTC |
Eggplant Functional
|
Keysight Technologies |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/06/2025 at 02:04:57 UTC |
Eggplant Salesforce Solution
|
Keysight Technologies |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/02/2025 at 15:06:27 UTC |
Epson Customer Participation
|
Epson |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/07/2025 at 01:24:59 UTC |
Epson Photo+
|
Epson |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/07/2025 at 01:24:59 UTC |
Epson Universal Serial Bus (USB) Display
|
Epson |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/07/2025 at 01:25:00 UTC |
everRun Enterprise
|
Stratus Technologies |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/06/2025 at 16:59:02 UTC |
EzConfig
|
Honeywell |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/06/2025 at 02:05:00 UTC |
FlashLink Program Manager
|
DeltaTrak Inc. |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/07/2025 at 01:25:00 UTC |
FSLogix client
|
Microsoft |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/07/2025 at 01:25:02 UTC |
Gangway
|
VMware |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/07/2025 at 01:25:02 UTC |
Genasys Protect
|
Genasys |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/08/2025 at 18:20:27 UTC |
Gibson Ridge (GR) 2 Analyst Weather Radar Analytics
|
Gibson Ridge Software LLC |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/07/2025 at 01:25:03 UTC |
GNU Tape Archiver (TAR)
|
Free Software Foundation |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/07/2025 at 01:25:03 UTC |
gPLINK
|
Harvard Medical School |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/08/2025 at 18:20:28 UTC |
Grason-Stadler Incorporation (GSI) Suite Software
|
Grason-Stadler |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/08/2025 at 13:17:39 UTC |
Interactive Data Extraction and Analysis (IDEA)
|
CaseWare International Inc. |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/06/2025 at 02:05:01 UTC |
International Business Machines (IBM) Security Guardium Key Lifecycle Manager
|
International Business Machines (IBM) |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/07/2025 at 01:25:04 UTC |
International Business Machines (IBM) Sterling Control Center
|
International Business Machines (IBM) |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/02/2025 at 15:06:28 UTC |
JavaServer Faces
|
Oracle |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/08/2025 at 18:20:29 UTC |
KWedge
|
MSS Software |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/02/2025 at 19:25:02 UTC |
LibreOffice
|
The Document Foundation |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/02/2025 at 19:25:03 UTC |
Loom
|
Atlassian Software Systems |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/08/2025 at 18:20:24 UTC |
Microsoft Power Automate Desktop
|
Microsoft |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/02/2025 at 19:25:02 UTC |
Microsoft Structured Query Langauage (SQL) Server System Common Language Runtime (CLR) Types (SQLSysCLRTypes)
|
Microsoft |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/07/2025 at 01:25:04 UTC |
Mouse Jiggler
|
Arkane Systems |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/02/2025 at 19:25:00 UTC |
MyViewBoard Whiteboard
|
ViewSonic |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/06/2025 at 02:04:59 UTC |
NET Electronic Payment (NETePay)
|
Datacap Systems, Inc. |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/02/2025 at 15:06:28 UTC |
NetWorker
|
Dell EMC |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/06/2025 at 16:59:03 UTC |
NVIDIA NSight Compute
|
NVIDIA |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/02/2025 at 15:06:29 UTC |
NVIDIA Nsight Systems
|
NVIDIA |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/02/2025 at 15:06:30 UTC |
OPN-2001 Companion Application Download Utility
|
Opticon USA |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/07/2025 at 01:25:05 UTC |
Oracle Java Database Connectivity (JDBC) Drivers
|
Oracle |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/02/2025 at 19:25:01 UTC |
PathSuite
|
SPOT Imaging Solutions |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/02/2025 at 19:25:01 UTC |
RStudio
|
Posit |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/02/2025 at 19:25:00 UTC |
SAMBA
|
Samba |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/06/2025 at 02:04:59 UTC |
SATO WS4 Printer Utility
|
Sato |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/06/2025 at 02:04:59 UTC |
Skyhigh Secure Web Gateway
|
Skyhigh Security |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/06/2025 at 02:05:00 UTC |
SoftPerfect Network Scanner
|
SoftPerfect |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/06/2025 at 02:05:00 UTC |
Spring Boot
|
VMware Tanzu Labs |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/02/2025 at 19:25:02 UTC |
Starburst Enterprise
|
Starburst |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/07/2025 at 01:25:05 UTC |
Statistical Analysis System (SAS)/CONNECT
|
SAS |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/07/2025 at 01:25:06 UTC |
Structured Query Language (SQL) Server Integration Services (SSIS) Integration Toolkit for Microsoft Dynamics 365
|
KingswaySoft |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/06/2025 at 02:05:00 UTC |
Symfit
|
MED-EL |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/02/2025 at 19:25:01 UTC |
Transaction Management
|
Edifecs |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/08/2025 at 18:20:23 UTC |
Wireless Local Area Network (WLAN) Medium Access Control (MAC) and Physical Layer (PHY)
|
IEEE |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/08/2025 at 18:20:29 UTC |
Xerox Device Manager
|
Xerox |
TRM Mgmt Group |
One-VA TRM v25.1 |
01/02/2025 at 19:25:02 UTC |
@RISK
|
Palisade |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/17/2024 at 16:21:52 UTC |
1E Client
|
1E |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/12/2024 at 16:25:05 UTC |
Ablation Confirmation (AC)
|
Johnson & Johnson MedTech |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:02 UTC |
Absolute Platform
|
Absolute Software |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/23/2024 at 17:09:03 UTC |
Acronis Cyber Protect Home Office
|
Acronis |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/10/2024 at 15:46:05 UTC |
ActivePDF Toolkit
|
Apryse Software Inc. |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/10/2024 at 15:46:05 UTC |
Acumen Fuse
|
Deltek |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/19/2024 at 17:25:09 UTC |
Adobe Creative Cloud Packager (CCP)
|
Adobe |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/19/2024 at 17:25:10 UTC |
Adobe Media Encoder
|
Adobe |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/24/2024 at 16:21:58 UTC |
Advanced Mechanical Technology, Inc. (AMTI) Balance Clinic
|
Advanced Mechanical Technology, Inc. (AMTI) |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/16/2024 at 14:58:57 UTC |
AGFA iPlan
|
AGFA HealthCare |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/16/2024 at 14:58:57 UTC |
AGi32
|
Lighting Analysts |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/27/2024 at 16:28:38 UTC |
Alive Clinical
|
Somatic Vision |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/27/2024 at 15:50:03 UTC |
Amazon Web Services (AWS) Command Line Interface (CLI)
|
Amazon Web Services |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/19/2024 at 17:25:10 UTC |
Amazon Web Services (AWS)-Shell
|
Amazon Web Services Labs |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/03/2024 at 15:13:38 UTC |
AMD Radeon
|
AMD |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/25/2024 at 18:22:51 UTC |
Anywhere RN
|
Omnicell |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:14 UTC |
Apache TomEE
|
Apache.org |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/10/2024 at 15:45:59 UTC |
Apollo Paging
|
Apollo Digital Paging Company |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/27/2024 at 16:28:38 UTC |
ArcGIS Maps for Office
|
Esri |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/16/2024 at 14:58:53 UTC |
ArGest Backup
|
Other World Computing |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/10/2024 at 15:46:03 UTC |
ASAP (As Soon As Possible) Utilities for Excel
|
A Must in Every Office BV |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/16/2024 at 14:58:53 UTC |
Aternity Extension for Agent
|
Riverbed |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/23/2024 at 17:31:16 UTC |
Attendance Enterprise
|
InfoTronics |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/10/2024 at 15:46:05 UTC |
AutoArchive Purge (AAP)
|
Lentech, Inc |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/16/2024 at 14:32:16 UTC |
Autodesk Infraworks
|
Autodesk, Inc. |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/17/2024 at 16:21:51 UTC |
Autodesk Revit
|
Autodesk, Inc. |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/24/2024 at 16:22:03 UTC |
AvaSure Telesitter
|
AvaSure, LLC |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/24/2024 at 16:22:09 UTC |
Avid Media Composer
|
Avid |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/16/2024 at 14:58:51 UTC |
Avid MediaCentral Production Management
|
Avid |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/23/2024 at 17:31:20 UTC |
BarcodeLib
|
Brad Barnhill |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/10/2024 at 15:46:07 UTC |
Beyond Compare
|
Scooter Software |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/23/2024 at 17:09:01 UTC |
BioPython
|
BioPython |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/11/2024 at 17:28:17 UTC |
Blue Prism Manifest v3 Impact Assessment Utility
|
SS&C Technologies, Inc |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/10/2024 at 15:46:02 UTC |
Bluzone Platform
|
HID Global |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:23 UTC |
BMC AMI DevX Abend-AID for Customer Information Control System (CICS)
|
BMC Software |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/19/2024 at 17:25:11 UTC |
BMC TrueSight Capacity Optimization
|
BMC Software |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/17/2024 at 16:21:53 UTC |
Bourne Again SHell (Bash)
|
GNU |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/09/2024 at 15:24:23 UTC |
Brekeke Session Initiation Protocol (SIP) Server
|
Brekeke |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/10/2024 at 15:46:02 UTC |
Business Information Server (BIS)
|
Unisys |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/19/2024 at 17:25:12 UTC |
CA 1 Tape Management
|
Broadcom |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/03/2024 at 15:13:37 UTC |
CA Disk Backup and Restore
|
Broadcom |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/25/2024 at 01:50:19 UTC |
CA-Application Performance Management (APM)-Probe
|
Broadcom |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/10/2024 at 15:46:05 UTC |
Cache Java Binding
|
InterSystems |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/11/2024 at 17:28:19 UTC |
Cache Objects
|
InterSystems |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/11/2024 at 17:28:19 UTC |
Cache Open Database Connectivity (ODBC) Driver
|
InterSystems |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/10/2024 at 15:46:03 UTC |
Cache Studio
|
InterSystems |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/11/2024 at 17:28:19 UTC |
cAdvisor
|
Google |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/23/2024 at 17:31:20 UTC |
Calendar Pro for Microsoft Teams
|
Witivio |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/17/2024 at 16:21:51 UTC |
California Verbal Learning Test - Second Edition (CVLT-II)
|
Pearson |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/23/2024 at 17:31:17 UTC |
California Verbal Learning Test - Third Edition (CVLT-III)
|
Pearson |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/23/2024 at 17:31:17 UTC |
Campaign Extension
|
Mandeeps |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/12/2024 at 16:58:22 UTC |
Campaign Monitor Extension
|
Mandeeps |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/12/2024 at 16:58:22 UTC |
Camunda Business Process Management (BPM) Platform
|
Camunda |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/12/2024 at 16:25:03 UTC |
CanoScan LiDE 120 Scanner Driver Package
|
Canon |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/17/2024 at 16:21:54 UTC |
CAPTCHA - Drupal Module
|
Drupal |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/16/2024 at 14:58:52 UTC |
Cardiovascular Angiography Analysis System (CAAS) Workstation
|
Pie Medical Imaging |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/23/2024 at 17:31:17 UTC |
Cardiovascular Orientation Program (CVOP)
|
Wes Todd |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/16/2024 at 14:58:55 UTC |
CAREpoint
|
General Devices |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/25/2024 at 18:22:52 UTC |
Cascading Style Sheets Mobile Profile (CSS-Mobile)
|
W3C |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/12/2024 at 16:58:22 UTC |
Centricity Universal Viewer (CUV)
|
GE Healthcare |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/12/2024 at 16:58:22 UTC |
Chaos Monkey
|
Netflix, Inc. |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/12/2024 at 16:58:22 UTC |
ChartReview
|
Department of Veterans Affairs, OIT Enterprise Program Management Office |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/12/2024 at 16:58:26 UTC |
Cirrhosis Order Set and Clinical Decision Support (CirrODS)
|
Health Services Research and Development Service (HSR&D) |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/27/2024 at 16:28:42 UTC |
Cisco Command Line Interface (CLI) Analyzer
|
Cisco Systems, Inc |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/17/2024 at 16:21:54 UTC |
CiteAdvisor
|
Thomson Reuters |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/16/2024 at 14:58:52 UTC |
Clean-Trace Data Trending Software
|
Neogen Corporation |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:03 UTC |
Clean-Trace Luminometer LX25 Synchronization Manager
|
Neogen Corporation |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/24/2024 at 16:22:08 UTC |
Clinical Assessment of Attention Deficit-Adult (CAT-A) Software Portfolio (SP)
|
PAR, Inc. |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/16/2024 at 14:58:55 UTC |
CliniComp
|
CliniComp International |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:15 UTC |
Clintegrity VA Chart Complete (VACC)
|
Nuance |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:03 UTC |
Cobas 6800/8800 Systems Archive Viewer
|
Roche Diagnostics |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/12/2024 at 16:58:26 UTC |
Coginiti
|
Coginiti |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/12/2024 at 16:58:26 UTC |
CommonLook Clarity
|
Allyant |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/12/2024 at 16:58:23 UTC |
CommonLook Office GlobalAccess
|
CommonLook |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/17/2024 at 16:21:54 UTC |
CommonLook PDF
|
NetCentric Technologies |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/10/2024 at 15:46:04 UTC |
Complete ControlRoom
|
Coapt, LLC |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/12/2024 at 16:58:27 UTC |
Computerized Diagnostic Interview Schedule, Version IV (C DIS-IV)
|
University of Florida Department of Epidemiology |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:17 UTC |
Computerized Patient Record System (CPRS) Lab Formatter
|
Frederick Howard |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/17/2024 at 16:21:48 UTC |
Connecto
|
Cantel Medical |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/19/2024 at 17:25:14 UTC |
Connexx
|
Signia Group |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/24/2024 at 16:22:00 UTC |
Constant Contact Extension
|
Mandeeps |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/19/2024 at 17:25:14 UTC |
Content Governance for SharePoint
|
Gimmal |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/10/2024 at 15:45:58 UTC |
CopyStorm
|
Capstorm |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/16/2024 at 14:58:57 UTC |
Corridor4DM
|
INVIA, LLC |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/17/2024 at 16:21:53 UTC |
Cryptographic Message Syntax (CMS)
|
Internet Engineering Task Force (IETF) |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:03 UTC |
CXone
|
NICE Systems |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/23/2024 at 17:31:20 UTC |
Cypress
|
Cypress |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/12/2024 at 16:58:26 UTC |
Data Exchange Layer (DXL)
|
Trellix |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/16/2024 at 14:58:52 UTC |
Databricks Open Database Connectivity (ODBC) Driver
|
Databricks / Open Source |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/19/2024 at 17:25:16 UTC |
DataDog Application Performance Monitoring (APM) Agent
|
Datadog, Inc. |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/23/2024 at 17:31:20 UTC |
DataPaq
|
Ziath |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/16/2024 at 14:58:57 UTC |
Decision Server
|
International Business Machines (IBM) |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/12/2024 at 16:58:28 UTC |
Delinea DirectManage
|
Centrify |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/17/2024 at 16:21:49 UTC |
Delis Kaplan Executive Function System (D-KEFS)
|
Pearson |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/12/2024 at 16:58:28 UTC |
Dell Command Configure
|
Dell EMC |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/16/2024 at 14:58:52 UTC |
Dell EMC Data Domain Boost (DD Boost) Windows Library
|
Dell EMC |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/16/2024 at 14:58:52 UTC |
Dell OpenManage Server Administrator (OMSA)
|
Dell |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/16/2024 at 14:58:53 UTC |
Desktop Validator
|
Axway |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/19/2024 at 17:25:16 UTC |
Digital Imaging and Communications in Medicine (DICOM) gateway
|
Cardioline |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:04 UTC |
Digital Imaging and Communications in Medicine (DICOM) Izer
|
NEHS DIGITAL |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/23/2024 at 17:31:18 UTC |
Digital Imaging and Communications in Medicine (DICOM) Toolkit (DCMTK)
|
Offis |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/17/2024 at 16:21:49 UTC |
Digital Monitoring Products (DMP) Remote Link
|
Digital Monitoring Products (DMP) |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/19/2024 at 17:25:17 UTC |
Digital Photo Professional
|
Canon |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/23/2024 at 17:31:21 UTC |
DirectControl
|
Delinea Inc. |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/09/2024 at 16:40:38 UTC |
DocFX
|
Microsoft |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/19/2024 at 17:25:22 UTC |
Docker Compose (Community)
|
Daniel Nephin |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/16/2024 at 14:32:14 UTC |
Docker Engine (Community)
|
Docker, Inc. |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/10/2024 at 15:00:20 UTC |
DPlot Graphing Software
|
DPlot |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/03/2024 at 15:13:35 UTC |
EasyLog 21CFR (Title 21 of the Code of Federal Regulations)
|
LASCAR |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/10/2024 at 15:46:04 UTC |
EasyLog Universal Serial Bus (USB)
|
LASCAR |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/27/2024 at 16:28:42 UTC |
ECFax Conductor
|
Cognosante |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/17/2024 at 16:21:51 UTC |
Ekahau Artificial Intelligence (AI) Pro
|
Ekahau, Inc. |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/11/2024 at 17:28:15 UTC |
ElbowSoft
|
Ottobock |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/23/2024 at 17:31:18 UTC |
ElbowSoft TMR
|
Ottobock |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:04 UTC |
Electronics For Imaging (EFI) Fiery Impose
|
EFI (Electronics For Imaging, Inc) |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/19/2024 at 17:25:23 UTC |
Element Three Dimension (3D)
|
Video Copilot |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/19/2024 at 17:25:23 UTC |
Elite Healthcare Supply Chain Management (SCM)
|
TECSYS Inc. |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/10/2024 at 15:46:03 UTC |
Emergency Recovery Utility NT (ERUNT)
|
Lars Hederer |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/19/2024 at 17:25:24 UTC |
Encryption Algorithm and IPsec
|
Internet Engineering Task Force (IETF) |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/19/2024 at 17:25:30 UTC |
Endicia Shipper
|
Endicia |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/17/2024 at 16:21:49 UTC |
EndNote Click
|
Clarivate Analytics |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/19/2024 at 17:25:25 UTC |
EngraveLab
|
CADlink Tech. Corp. |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/03/2024 at 15:13:36 UTC |
ePad Universal Installer
|
ePadLink |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/11/2024 at 17:28:16 UTC |
Epson Copy Utility
|
Epson |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/19/2024 at 17:25:26 UTC |
EthoVision Extra (XT)
|
Noldus |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/23/2024 at 17:31:21 UTC |
Evidence Library 4 Web
|
Motorola Solutions, Inc. |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/12/2024 at 16:58:23 UTC |
Extensible Authentication Protocol (EAP)
|
Internet Engineering Task Force (IETF) |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:17 UTC |
Fargo Workbench
|
HID Global |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:06 UTC |
Fast Dump Restore Volume Incremental Backup (FDRINCR)
|
BMC Software |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/23/2024 at 17:31:21 UTC |
Fast Healthcare Interoperability Resources Specification (FHIR)
|
HL7 |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/16/2024 at 14:32:15 UTC |
FastMember.Signed
|
Marc Gravell |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/23/2024 at 17:31:21 UTC |
Feith CheckIn
|
Feith Systems and Software, Inc. |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:24 UTC |
Feith COLD
|
Feith Systems and Software, Inc. |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:24 UTC |
Feith Control Panel
|
Feith Systems and Software, Inc. |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:25 UTC |
Feith Dashboard iQ Designer
|
Feith Systems and Software, Inc. |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:24 UTC |
Feith Document Database (FDD)
|
Feith Systems and Software, Inc. |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/27/2024 at 16:28:39 UTC |
Feith Document Database (FDD) Power Client
|
Feith Systems and Software, Inc. |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:25 UTC |
Feith EDStor
|
Feith Systems and Software, Inc. |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:25 UTC |
Feith EDStor Server
|
Feith Systems and Software, Inc. |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:26 UTC |
Feith Forms iQ Designer
|
Feith Systems and Software, Inc. |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:26 UTC |
Feith Forms iQ Server
|
Feith Systems and Software, Inc. |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:27 UTC |
Feith Harrier
|
Feith Systems and Software, Inc. |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:26 UTC |
Feith Print to Feith Document Database (FDD)
|
Feith Systems and Software, Inc. |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:27 UTC |
Feith Quick Integrator (QI)
|
Feith Systems and Software, Inc. |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:27 UTC |
Feith Raptor
|
Feith Systems and Software, Inc. |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:28 UTC |
Feith Reports iQ Service
|
Feith Systems and Software, Inc. |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:28 UTC |
Feith Rules Engine (REX)
|
Feith Systems and Software, Inc. |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:29 UTC |
Feith Universal Text Recognition (UTR)
|
Feith Systems and Software, Inc. |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:28 UTC |
Feith Vortex
|
Feith Systems and Software, Inc. |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:29 UTC |
Feith WebFDD (Web Feith Document Database)
|
Feith Systems and Software, Inc. |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:29 UTC |
Feith Workflow iQ Manager
|
Feith Systems and Software, Inc. |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:30 UTC |
Fences
|
Stardock |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/25/2024 at 01:50:21 UTC |
Fiery Compose
|
Fiery, LLC |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/25/2024 at 01:50:19 UTC |
FILMeasure
|
FILMETRICS |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:23 UTC |
First Responder Sandbox (FRS)
|
CESI EDGE |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/16/2024 at 14:58:56 UTC |
Firstbeat Bodyguard 3 Exporter
|
Firstbeat |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:17 UTC |
FitPro Ultra Fit Test Software
|
TSI Inc. |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/12/2024 at 16:25:05 UTC |
Fluke SmartView Classic
|
Fluke |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/12/2024 at 16:58:28 UTC |
Free Alarm Clock
|
Comfort Software Group |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/23/2024 at 17:31:21 UTC |
Fusion Voice Manager
|
Dolbey |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/23/2024 at 17:31:21 UTC |
FusionLive
|
E-Control Systems |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/27/2024 at 16:28:41 UTC |
Gaming Mechanics
|
Mandeeps |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/12/2024 at 16:58:23 UTC |
GanttProject
|
Bardsoftware |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/19/2024 at 17:25:07 UTC |
Genie
|
Oticon |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/24/2024 at 16:22:04 UTC |
Glink
|
Gallagher & Robertson (G&R) |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/16/2024 at 14:58:56 UTC |
Globalscape EFT
|
Optum, Inc. |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/27/2024 at 15:50:04 UTC |
GMetrix Short Message Service (SMS) for Windows
|
GMetrix, LLC |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/16/2024 at 14:58:57 UTC |
GNU Image Manipulation Program (GIMP)
|
GIMP |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/23/2024 at 17:31:22 UTC |
GNU Octave
|
Free Software Foundation |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/19/2024 at 17:25:26 UTC |
Go Programming Language
|
The Go Project |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/09/2024 at 15:24:22 UTC |
GoldenGate Stream Analytics (GGSA)
|
Oracle |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/10/2024 at 15:46:02 UTC |
Graphisoft ArchiCAD (Computer Aided Design)
|
Graphisoft |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/12/2024 at 16:58:23 UTC |
H2 Database Engine
|
Thomas Mueller |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/09/2024 at 16:40:37 UTC |
Hasher (EZ Tools)
|
Eric Zimmerman |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/03/2024 at 15:13:36 UTC |
HCL Digital Experience
|
HCL Technologies, Limited |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/23/2024 at 17:31:22 UTC |
Healthmark Scope Viewer
|
Healthmark Industries |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/27/2024 at 16:28:40 UTC |
HealthShare
|
InterSystems |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/25/2024 at 18:22:50 UTC |
Helmberg-SCORE 5
|
CareDx Inc. |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/17/2024 at 16:21:53 UTC |
Helpdesk Extension
|
Mandeeps |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/10/2024 at 15:46:06 UTC |
Hewlett Packard Capture and Route (HPCR)
|
Hewlett Packard Enterprise |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/23/2024 at 17:31:22 UTC |
HID ActivID Credential Management System
|
HID Global |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/16/2024 at 14:58:54 UTC |
HL7 SMART Application Launch Framework
|
HL7 |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/23/2024 at 17:09:00 UTC |
Hortonworks Data Platform (HDP)
|
Cloudera |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/23/2024 at 17:31:19 UTC |
HP P6000 Command View Software
|
HP |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/23/2024 at 17:31:19 UTC |
HTCondor
|
HTCondor |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/24/2024 at 16:22:09 UTC |
IBM KeneXa Learning Content Management System (LCMS)
|
International Business Machines (IBM) |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/12/2024 at 16:58:23 UTC |
iCal4j
|
iCal4j |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/09/2024 at 15:24:22 UTC |
iCalendar
|
Internet Engineering Task Force (IETF) |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/03/2024 at 15:13:37 UTC |
ImageMagick
|
ImageMagick Studio LLC |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:23 UTC |
imagePROGRAF Print Plug-In for Office
|
Canon |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/12/2024 at 16:58:23 UTC |
imagePROGRAF Status Monitor
|
Canon |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/12/2024 at 16:58:24 UTC |
iMedConsent Web (ICW)
|
Taylor Healthcare |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/24/2024 at 16:21:59 UTC |
Immuta
|
Immuta Inc. |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/25/2024 at 01:50:18 UTC |
IncrediBuild
|
IncrediBuild Software Ltd |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:06 UTC |
inFlow On-Premise
|
Archon Systems, Inc. |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/10/2024 at 15:45:59 UTC |
Informatica PowerExchange
|
Informatica |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:08 UTC |
Insight Control
|
HP |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/23/2024 at 17:31:19 UTC |
INSIGHT Location Intelligence Platform
|
Nesa Solutions, Inc. |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:07 UTC |
IntelliSpace Cardiovascular (ISCV)
|
Philips |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/24/2024 at 16:22:07 UTC |
Intergrated Security Tool (IST)
|
Philips |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/12/2024 at 16:58:24 UTC |
International Business Machines (IBM) Equal Access Accessibility Checker
|
International Business Machines (IBM) Accessibility |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/27/2024 at 16:28:42 UTC |
International Business Machines (IBM) Installation Manager
|
International Business Machines (IBM) |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/19/2024 at 17:25:27 UTC |
International Business Machines (IBM) Sterling Transformation Extender (STE)
|
International Business Machines (IBM) |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:07 UTC |
Internet Protocol (IP)
|
Internet Engineering Task Force (IETF) |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/23/2024 at 17:31:19 UTC |
Inter-Program Command Processor (IPCP) Plus
|
Software Diversified Services (SDS) |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:01 UTC |
Ivanti Application Control
|
Ivanti |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/23/2024 at 17:31:22 UTC |
Ivanti Endpoint Agent
|
Ivanti |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/23/2024 at 17:31:22 UTC |
Ivanti Patch
|
Ivanti |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/23/2024 at 17:31:19 UTC |
Ivanti Performance Manager
|
Ivanti |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/25/2024 at 01:50:20 UTC |
Jamovi
|
Jamovi |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/27/2024 at 16:28:40 UTC |
Java Quick Network (jNQ) Server Message Block (SMB) Client
|
Visuality Systems |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/12/2024 at 16:58:24 UTC |
Jekyll
|
Jekyll |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/23/2024 at 17:08:25 UTC |
jPDFEditor
|
Qoppa Software |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/25/2024 at 01:50:20 UTC |
JTB FlexReport LT
|
JTB World |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/10/2024 at 15:45:59 UTC |
Juicer
|
Digital Juice |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/25/2024 at 01:50:20 UTC |
JumpMind SymmetricDS
|
JumpMind |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/25/2024 at 01:50:22 UTC |
JXplorer
|
Jxplorer |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/25/2024 at 01:50:22 UTC |
Karma-Jasmine
|
Karma |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/27/2024 at 16:28:40 UTC |
Karma-PhantomJS-Launcher
|
Karma |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/27/2024 at 16:28:40 UTC |
Keysight Tool IxNetwork
|
Keysight Technologies |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/12/2024 at 16:25:03 UTC |
Keysight Tool IxVeriWave
|
Keysight Technologies |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/23/2024 at 17:08:24 UTC |
K-Soft
|
Ottobock |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/27/2024 at 16:28:40 UTC |
Kuando Busylight
|
Plenom |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/17/2024 at 16:21:50 UTC |
Kubernetes
|
Kubernetes |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/09/2024 at 15:24:22 UTC |
Kubernetes Command-Line Tool (kubectl)
|
Kubernetes |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/09/2024 at 15:24:20 UTC |
LAME
|
Buanzo (Arturo Busleiman) |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/10/2024 at 15:46:06 UTC |
Lexmark Data Collection Manager
|
Lexmark |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/19/2024 at 01:09:36 UTC |
Library and Tape Tools (L&TT)
|
HPE |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/25/2024 at 01:50:22 UTC |
Life Table Analysis System (LTAS)
|
National Institute for Occupational Safety and Health (NIOSH) |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/27/2024 at 16:28:40 UTC |
LightSpeed
|
Entech Signs |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/17/2024 at 16:21:52 UTC |
Live Forums
|
Mandeeps |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/12/2024 at 16:58:24 UTC |
Live Tabs
|
Mandeeps |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/12/2024 at 16:58:24 UTC |
Live Tokens
|
Mandeeps |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/12/2024 at 16:58:25 UTC |
Live Tooltip
|
Mandeeps |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/12/2024 at 16:58:25 UTC |
Live Utilities
|
Mandeeps |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/12/2024 at 16:58:25 UTC |
Local Group Policy Object (LGPO) Utility
|
Microsoft |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/25/2024 at 01:50:23 UTC |
Long Path Tool
|
DxSoft, Inc. |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/10/2024 at 15:00:19 UTC |
Maine Crash Reporting System (MCRS)
|
Equifax |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/12/2024 at 16:58:26 UTC |
Materialise Magics
|
Materialise |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/25/2024 at 18:22:51 UTC |
Media YouTube - Drupal Module
|
Drupal |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:30 UTC |
MediaCentral | Cloud UX
|
Avid |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/25/2024 at 01:50:23 UTC |
MedNX OfficeNode Service
|
Open Text |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/25/2024 at 01:50:19 UTC |
MegaRAID Storage Management (MSM)
|
Broadcom |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/25/2024 at 01:50:23 UTC |
Microsoft Analysis Services OLE DB Provider
|
Microsoft |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:08 UTC |
Microsoft Azure Active Directory for Windows PowerShell
|
Microsoft |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/25/2024 at 01:50:24 UTC |
Microsoft Azure Command Line Interface (CLI)
|
Microsoft |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/19/2024 at 01:09:37 UTC |
Microsoft Excel
|
Microsoft |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 15:07:46 UTC |
Microsoft Mouse without Borders
|
Microsoft |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/25/2024 at 01:50:24 UTC |
Microsoft Office Online Server
|
Microsoft |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:08 UTC |
Microsoft Power Business Intelligence (BI) Report Server
|
Microsoft |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/09/2024 at 16:40:37 UTC |
Microsoft Visio Software Development Kit (SDK)
|
Microsoft |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/23/2024 at 17:31:22 UTC |
Microsoft Visual Studio
|
Microsoft |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 15:07:47 UTC |
MicrosoftPowerBIMgmt
|
Microsoft |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:09 UTC |
Migrate - Drupal Module
|
Drupal |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/25/2024 at 01:50:25 UTC |
MigrationFX
|
Unified FX Ltd, |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/24/2024 at 16:22:02 UTC |
ModLink
|
Nuance |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/25/2024 at 18:22:52 UTC |
MotionTools
|
Gyration |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/27/2024 at 16:28:38 UTC |
Muffet
|
Yota Toyama |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/23/2024 at 17:09:02 UTC |
Multiline Client (MLC)
|
NEC |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/12/2024 at 16:58:25 UTC |
Multipoint Application Sharing
|
ITU |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:11 UTC |
Multipoint Still Image and Annotation Protocol
|
ITU |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/25/2024 at 01:50:25 UTC |
Nagstamon
|
Nagstamon |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/10/2024 at 15:46:06 UTC |
Neighbor Discovery for IPv6
|
Internet Engineering Task Force (IETF) |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:09 UTC |
Nero Burning ROM
|
Nero |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/25/2024 at 01:50:25 UTC |
NestJS
|
Trilon |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/09/2024 at 15:24:26 UTC |
NetApp PowerShell Toolkit
|
Microsoft |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/12/2024 at 16:58:26 UTC |
NetApp SnapDrive
|
NetApp |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/25/2024 at 01:50:26 UTC |
NetVR
|
Lenel S2 |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/16/2024 at 14:58:53 UTC |
Network Connection Repair Tool
|
Brother International |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/12/2024 at 16:58:25 UTC |
No Magic Cameo Collaborator for Teamwork Cloud
|
3DS |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/19/2024 at 17:25:27 UTC |
No Magic Magic Draw
|
No Magic, Inc. |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/25/2024 at 01:50:26 UTC |
NoReplyAll Outlook Add-In
|
Microsoft |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:09 UTC |
Office Open XML
|
ISO |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/25/2024 at 01:50:26 UTC |
Office Timeline
|
Office Timeline |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/12/2024 at 16:58:27 UTC |
OL Connect
|
Upland Software, Inc |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:10 UTC |
OpenSC (Smart Card)
|
OpenSC (Smart Card) |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/16/2024 at 14:58:55 UTC |
OpenSCAP
|
Red Hat |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/25/2024 at 01:50:26 UTC |
OpenShift Container Platform
|
Red Hat |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/23/2024 at 17:08:26 UTC |
OpenText RightFax
|
OpenText |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/12/2024 at 16:25:04 UTC |
OpenText Unified Functional Testing (UFT) One
|
OpenText |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/09/2024 at 15:24:23 UTC |
OpUtils
|
ManageEngine |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/25/2024 at 01:50:27 UTC |
Oracle ASR (Auto Service Request)
|
Oracle |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:18 UTC |
Oracle Database Gateway
|
Oracle |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/27/2024 at 16:28:38 UTC |
Oracle Hypertext Transfer Protocol (HTTP) Server
|
Oracle |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:18 UTC |
Oracle OSWatcher Black Box (OSWbb)
|
Oracle |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:24 UTC |
Oracle Service-Oriented Architecture (SOA) for Healthcare Integration
|
Oracle |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:19 UTC |
Oracle Smart View for Office
|
Oracle |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/16/2024 at 00:52:52 UTC |
OrgChart
|
OfficeWork Software |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/17/2024 at 16:21:50 UTC |
OTCnet
|
Bureau of the Fiscal Service |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/16/2024 at 14:32:15 UTC |
Out of Band Manager (OBM)
|
CDI |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/27/2024 at 16:28:39 UTC |
Page Protection
|
Mandeeps |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/16/2024 at 14:58:56 UTC |
PDFsam Basic
|
PDFsam |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/12/2024 at 16:25:04 UTC |
PECmd
|
Eric Zimmerman |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/25/2024 at 01:50:27 UTC |
Personal Credential Assistant (PCA)
|
Cyber Armed |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/09/2024 at 16:40:37 UTC |
Phonak Target
|
Phonak |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/19/2024 at 01:09:37 UTC |
Pinnacle Access Control Platform
|
Sielox LLC |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/17/2024 at 16:21:50 UTC |
PiWriter
|
Pyramid Innovation |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/12/2024 at 16:58:28 UTC |
Portable Document File Creator (PDFCreator)
|
pdfforge |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/16/2024 at 14:58:54 UTC |
Portable Document Format (PDF) Generator Extension
|
Mandeeps |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/16/2024 at 14:58:57 UTC |
Portable Document Format (PDF) Stamper Extension
|
Mandeeps |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/16/2024 at 14:58:54 UTC |
Porto
|
Mandeeps |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/17/2024 at 16:21:52 UTC |
Post Office Protocol (POP3)
|
Internet Engineering Task Force (IETF) |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/16/2024 at 14:58:54 UTC |
Power Analysis & Sample Size (PASS)
|
NCSS Statistical Software |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/09/2024 at 15:24:21 UTC |
PraediCare
|
BitScopic |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/25/2024 at 01:50:27 UTC |
Project Parking
|
Marquis Broadcast |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:11 UTC |
Proof of Delivery
|
MSS Software |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/27/2024 at 16:28:37 UTC |
Provar
|
Provar |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/27/2024 at 15:50:03 UTC |
Pyannote.audio
|
Github |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/12/2024 at 16:25:04 UTC |
Quadient Impress
|
Quadient |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/27/2024 at 16:28:41 UTC |
QuickDoc Portal (QDPortal)
|
New England Survey Systems |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/23/2024 at 17:31:22 UTC |
Rapidworks
|
NextEngine |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/16/2024 at 14:58:56 UTC |
Red Hat Satellite and Proxy
|
Red Hat |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/27/2024 at 16:28:37 UTC |
Redirect - Drupal Module
|
Dave Reid |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/23/2024 at 17:31:23 UTC |
Relativity Server
|
Relativity ODA LLC |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/16/2024 at 14:58:55 UTC |
Remedy
|
BMC Software |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:19 UTC |
Request Management for Windows Azure Pack (WAP)
|
GridPro |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:20 UTC |
Rocket SmartEdit
|
Rocket Software Inc. |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/12/2024 at 16:58:25 UTC |
Roland 2.5D Driver
|
Roland DGA Corporation |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/27/2024 at 16:28:39 UTC |
R-Studio
|
R-Tools Technology Inc. |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/10/2024 at 15:45:58 UTC |
Scala Digital Signage Software
|
Scala |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/16/2024 at 14:58:56 UTC |
Scanner Central Admin
|
Fujitsu |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/25/2024 at 01:50:20 UTC |
Secure File Transfer Protocol (SFTP)
|
Internet Engineering Task Force (IETF) |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:20 UTC |
Security Requirements for Cryptographic Modules
|
National Institute of Standards and Technology (NIST) |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:20 UTC |
Security Technical Implementation Guide (STIG) Viewer
|
Defense Information Systems Agency |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:21 UTC |
SelectSurvey.NET
|
ClassApps |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/10/2024 at 15:45:58 UTC |
SendSuite Tracking Assistant (TA Plus)
|
Pitney Bowes |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/16/2024 at 14:58:51 UTC |
SharePoint Online Management Shell
|
Microsoft |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:21 UTC |
ShortKeys
|
Insight Software Solutions |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/27/2024 at 16:28:39 UTC |
Signal
|
Cambridge Electronic Design |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/27/2024 at 16:28:39 UTC |
SignWord Pro
|
APCO |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:21 UTC |
Simple Mail Transfer Protocol (SMTP)
|
Internet Engineering Task Force (IETF) |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:22 UTC |
SIMULATIONiQ Enterprise
|
Education Management Solutions |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/24/2024 at 16:22:06 UTC |
Singlewire InformaCast Advanced Notification
|
Singlewire Software |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/23/2024 at 17:08:28 UTC |
SiteScope
|
Open Text |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/27/2024 at 16:28:37 UTC |
Smart IDesigner
|
iDP |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/19/2024 at 17:25:28 UTC |
SMART Ink
|
SMART Technologies |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/27/2024 at 16:28:37 UTC |
SmartDraw
|
SmartDraw Software |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/12/2024 at 16:58:27 UTC |
SolarWinds Web Help Desk (WHD)
|
SolarWinds |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/09/2024 at 15:24:24 UTC |
Sonatype Nexus Repository
|
SonaType |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/09/2024 at 15:24:24 UTC |
Spreadsheet Compare
|
Microsoft |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:30 UTC |
StreamWeaver
|
BMC Software |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/16/2024 at 14:58:51 UTC |
StresStimulus
|
Stimulus Technology |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/12/2024 at 16:58:28 UTC |
Supermicro Server Manager (SSM)
|
Super Micro |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/27/2024 at 16:28:42 UTC |
Synergy Reports
|
Jack Henry & Associates |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/27/2024 at 16:28:34 UTC |
Systems Insight Manager
|
Hewlett Packard Enterprise |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:14 UTC |
Talend Open Studio for Enterprise Service Bus (ESB)
|
Talend |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:01 UTC |
TempTrak
|
Cooper-Atkins |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/12/2024 at 16:58:27 UTC |
Thermopatch TITAN
|
Thermopatch |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 17:51:01 UTC |
TIBCO Spotfire Statistics Services
|
TIBCO |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/12/2024 at 16:58:27 UTC |
Time Machine
|
Solution Soft |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/27/2024 at 16:28:35 UTC |
Timeline Explorer (EZ Tools)
|
Eric Zimmerman |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/25/2024 at 01:50:29 UTC |
TMS Visual Component Library (VCL) User Interface (UI) Pack
|
TMS Software |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/10/2024 at 15:46:06 UTC |
TMSComm
|
Pneumercator Inc. |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/19/2024 at 17:25:29 UTC |
Topcon EZ-Capture
|
TOPCON |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/10/2024 at 15:46:04 UTC |
Total Access Admin
|
FMS |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/16/2024 at 14:58:53 UTC |
Total Access Analyzer
|
FMS |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/27/2024 at 16:28:35 UTC |
Total Access Detective
|
FMS |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/27/2024 at 16:28:35 UTC |
Total Access Emailer
|
FMS |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/23/2024 at 17:31:20 UTC |
Total Access Memo
|
FMS |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/16/2024 at 14:58:54 UTC |
Total Visual SourceBook
|
FMS |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/27/2024 at 16:28:36 UTC |
Trapcode EchoSpace
|
Maxon |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/27/2024 at 16:28:36 UTC |
Trapcode Form
|
Maxon |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/27/2024 at 16:28:36 UTC |
Trapcode Horizon
|
Maxon |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/27/2024 at 16:28:36 UTC |
Trapcode Mir
|
Maxon |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/27/2024 at 16:28:36 UTC |
Trapcode Particular
|
Maxon |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/27/2024 at 16:28:36 UTC |
Trapcode Shine
|
Maxon |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/27/2024 at 16:28:36 UTC |
Trapcode Sound Keys
|
Maxon |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/27/2024 at 16:28:37 UTC |
Trellix Endpoint Security (ENS)
|
Trellix |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/27/2024 at 15:50:03 UTC |
United States Core Data for Interoperability (USCDI)
|
ONC |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/12/2024 at 16:25:03 UTC |
UNIX
|
The Open Group |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/16/2024 at 14:58:51 UTC |
Veterans Health Information Systems and Technology Architecture (VistA) Integration Adapter (VIA)
|
VA OIT Product Development |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/10/2024 at 15:46:03 UTC |
VirtualBox
|
Oracle |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/27/2024 at 16:28:37 UTC |
vMix
|
StudioCoast Pty Ltd. |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/16/2024 at 14:58:54 UTC |
Vocera Communications Platform
|
Stryker |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/27/2024 at 15:50:02 UTC |
VoiceOver Pathology Reporting Optimized (PRO)
|
Voicebrook |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/19/2024 at 01:09:37 UTC |
WavePad Sound Editor
|
NCH Software |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/16/2024 at 14:58:55 UTC |
Webex Recording Editor
|
Cisco Systems, Inc |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/12/2024 at 16:58:25 UTC |
Webpack
|
Webpack |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/26/2024 at 15:07:47 UTC |
Windows 10 Timeline database parser (WxTCmd) (EZ Tools)
|
Eric Zimmerman |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/25/2024 at 01:50:29 UTC |
Windows Terminal
|
Microsoft |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/16/2024 at 14:58:54 UTC |
Winsteps
|
WinSteps |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/10/2024 at 15:46:04 UTC |
Wireshark
|
Wireshark.org |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/16/2024 at 14:32:15 UTC |
Xceed Zip for .NET
|
Xceed |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/25/2024 at 01:50:21 UTC |
XSensor Pro Foot and Gait
|
XSENSOR Technology |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/12/2024 at 16:58:27 UTC |
Zebra Price Management Execution (PME)
|
Zebra Technologies |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/12/2024 at 16:58:28 UTC |
ZebraLink Enterprise Connector
|
Zebra Technologies |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/16/2024 at 14:58:55 UTC |
Zenoss Analytics
|
Zenoss Inc. |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/10/2024 at 15:46:07 UTC |
Zoom CallREC
|
eleveo |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/19/2024 at 17:25:29 UTC |
Zstandard (zstd)
|
Meta |
TRM Mgmt Group |
One-VA TRM v24.9 |
09/12/2024 at 16:58:29 UTC |
2020 CAP
|
2020 Spaces, A Cyncly Company |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/01/2024 at 15:53:40 UTC |
22Miles
|
22Miles |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:05 UTC |
3M Core Grouping Software (CGS)
|
Solventum |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/29/2024 at 15:55:03 UTC |
AcqKnowledge Software
|
BIOPAC Systems, Inc |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:03 UTC |
Active Server Pages (ASP).NET Asynchronous JavaScript And Extensible Markup Language (XML) (AJAX)
|
DevExpress |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/29/2024 at 15:54:44 UTC |
Activity Measure for Post Acute Care (AM-PAC)
|
Pearson |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/29/2024 at 15:54:51 UTC |
Adenosine triphosphate (ATP) Complete
|
Ruhof |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/02/2024 at 19:01:16 UTC |
Adobe Dimension Creative Cloud (CC)
|
Adobe |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/27/2024 at 02:02:54 UTC |
Adobe XD Creative Cloud (CC)
|
Adobe |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/26/2024 at 15:09:15 UTC |
Advanced Extensible Markup Language (XML) Schema Patterns for Databinding
|
W3C |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:04 UTC |
Affinity Designer
|
Affinity |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:06 UTC |
AForge.NET
|
AForge.NET |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/29/2024 at 15:54:58 UTC |
Altair Monarch
|
Altair Knowledge Works |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/02/2024 at 19:01:15 UTC |
Amazon Web Services (AWS) Serverless Application Model (SAM)
|
Amazon Web Services |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/27/2024 at 02:03:07 UTC |
Amion Desktop Scheduler (OnCall)
|
Amion |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/27/2024 at 02:03:19 UTC |
Andover Continuum
|
Schneider Electric |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:06 UTC |
Android Studio
|
Google |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/13/2024 at 13:28:45 UTC |
ANSOS Scheduling Solutions
|
HealthStream |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/30/2024 at 16:19:28 UTC |
Apache Commons Validator (CV)
|
Apache Software Foundation (ASF) |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:03 UTC |
Apache CXF
|
Apache Software Foundation (ASF) |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/01/2024 at 15:53:43 UTC |
Apache Freemarker
|
Apache |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/29/2024 at 15:55:01 UTC |
Apache Kafka
|
Apache Software Foundation (ASF) |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/27/2024 at 02:02:59 UTC |
Apache Kafka Cluster Visualization (AKHQ)
|
Apache Software Foundation (ASF) |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/13/2024 at 13:28:45 UTC |
Apache Neethi
|
Apache |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:04 UTC |
Apache Zeppelin
|
Apache |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/29/2024 at 15:54:57 UTC |
Apollo arccCore
|
Apollo Enterprise Imaging |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/30/2024 at 16:19:27 UTC |
Apple Configurator
|
Apple |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/30/2024 at 16:19:29 UTC |
Application Virtualization (App-V) Client
|
Microsoft |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/30/2024 at 16:19:30 UTC |
AppSpace
|
Appspace |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:06 UTC |
Arduino Integrated Development Environment (IDE)
|
Arduino |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/29/2024 at 15:55:00 UTC |
Aternity Activity Designer
|
Riverbed |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/30/2024 at 16:19:27 UTC |
Aternity Web Activity Creator (WAC)
|
Riverbed |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/30/2024 at 16:19:30 UTC |
ATMOS Diagnostic World
|
ATMOS MedizinTechnik GmbH & Co. KG |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:04 UTC |
AutoDocs
|
AutoMail |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:07 UTC |
Autofac
|
Autofac Contributors |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:04 UTC |
AutoRabit CodeScan for Visual Studio (VS) Code Plugin
|
AutoRabit |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/12/2024 at 15:25:14 UTC |
Avigilon Control Center (ACC)
|
Avigilon |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:06 UTC |
AXON Fleet Dashboard
|
Axon |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/14/2024 at 18:01:42 UTC |
AxonSoft
|
Ottobock |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/29/2024 at 15:54:59 UTC |
Azure Data Studio
|
Microsoft |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/12/2024 at 15:25:16 UTC |
B. Braun Space Online Suite Rx
|
B. Braun Medical Inc. |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:04 UTC |
Babel-Core
|
BabelJS |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:04 UTC |
Babel-Runtime
|
BabelJS |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:04 UTC |
BAMNostic
|
Python Software Foundation |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/29/2024 at 15:54:58 UTC |
Basic Input/Output System (BIOS) Configuration Utility (BCU)
|
HP |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/29/2024 at 15:54:44 UTC |
BD Synapsys
|
Becton, Dickinson and Company |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/27/2024 at 02:02:42 UTC |
bebalance+
|
Ottobock |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/29/2024 at 15:54:50 UTC |
BMC Helix Continuous Optimization
|
BMC Software |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/16/2024 at 18:06:50 UTC |
BreezeSuite
|
MGC Diagnostics |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/29/2024 at 15:54:51 UTC |
CapsoView
|
CapsoVision |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/29/2024 at 15:55:01 UTC |
CareWare
|
CareSystems, Inc |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/12/2024 at 15:25:19 UTC |
Causal Diagramming Tool
|
Outcome Engenuity |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:05 UTC |
CenTrak Hand Hygiene Compliance
|
CenTrak |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/13/2024 at 19:16:07 UTC |
CenTrak Prism
|
CenTrak |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/13/2024 at 19:16:07 UTC |
ChangeGear
|
SunView Software Inc. |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:06 UTC |
Circle Cardiovascular Imaging (cvi42)
|
Circle Cardiovascular Imaging |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/12/2024 at 15:25:16 UTC |
Cisco AnyConnect Secure Mobility Client
|
Cisco Systems, Inc |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/15/2024 at 17:13:03 UTC |
Cisco Intersight
|
Cisco Systems, Inc |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:07 UTC |
Cisco Jabber for Windows
|
Cisco Systems, Inc |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/26/2024 at 15:09:11 UTC |
Cockroach Database (CockroachDB)
|
Cockroach Labs |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/30/2024 at 16:19:25 UTC |
Commvault ContentStore
|
CommVault Systems |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/27/2024 at 02:03:13 UTC |
Connex Central Station (CS)
|
Baxter |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/01/2024 at 15:53:43 UTC |
ControlUp
|
ControlUp Technologies |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/29/2024 at 15:54:40 UTC |
CPExpert
|
Computer Management Sciences, Inc. |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/27/2024 at 02:03:11 UTC |
CURL (Colorado University Record Linkage)
|
Colorado University |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/29/2024 at 15:55:01 UTC |
CyberArk Privileged Session Manager (PSM) Client
|
CYBERARK |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/19/2024 at 14:47:30 UTC |
Darkroom Booth
|
Darkroom Software |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:07 UTC |
Data Protocols for Multimedia Conferencing - Generic Conference Control
|
ITU |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:07 UTC |
Dell EMC SupportAssist Enterprise
|
Dell |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/27/2024 at 15:30:03 UTC |
DemandTools
|
Validity |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/30/2024 at 16:19:26 UTC |
DicomCleaner
|
PixelMed Publishing |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/27/2024 at 02:03:20 UTC |
DocuPrinter
|
Neevia Technology |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:07 UTC |
DuckDB
|
DuckDB |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/16/2024 at 18:06:52 UTC |
Dynamics 365 Configuration Migration Tool (CMT)
|
Microsoft |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:08 UTC |
EclipseCrossword
|
Green Eclipse |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:07 UTC |
Electronic Signature Extension
|
Mandeeps |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/30/2024 at 16:19:27 UTC |
Electronics for Imaging (EFI) Fiery System Software for Digital Print Servers
|
EFI (Electronics For Imaging, Inc) |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/29/2024 at 15:54:40 UTC |
emWave
|
HeartMath |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/06/2024 at 18:45:04 UTC |
Entity Application Programming Interface (API) - Drupal Module
|
Drupal |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:07 UTC |
Expat Extensible Markup Language (XML) Parser
|
Github |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/15/2024 at 17:13:07 UTC |
Extensible Markup Language (XML) Sitemap - Drupal Module
|
Drupal |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:08 UTC |
Feith Dashboard iQ Server
|
Feith Systems and Software, Inc. |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/29/2024 at 15:54:58 UTC |
FlexSim Healthcare
|
FlexSim Software Products, Inc. |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/29/2024 at 15:54:42 UTC |
FORUM
|
Zeiss |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/01/2024 at 13:16:42 UTC |
Forward-Looking Infrared (FLIR) Tools
|
FLIR Systems, Inc. |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/29/2024 at 15:54:52 UTC |
Fusion Voice Player
|
Dolbey |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:05 UTC |
GeoIPUpdate
|
MaxMind, Inc |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/27/2024 at 02:02:51 UTC |
Ghost Content Management System (CMS)
|
The Ghost Foundation |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:08 UTC |
Grunt
|
OpenJS Foundation |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/16/2024 at 18:06:53 UTC |
Hazard Analysis Critical Control Points (HACCP) Manager
|
Copeland |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:08 UTC |
Health Level Seven (HL7) Clinical Document Architecture (CDA) Release Two (R2) Implementation Guide: Consolidated CDA Templates for Clinical Notes
|
HL7 |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/02/2024 at 19:01:14 UTC |
Health Level Seven (HL7) Version Two (V2) Product Suite
|
HL7 |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/16/2024 at 18:06:47 UTC |
HemaTrax-Cellular Therapy (CT)
|
Digi-Trax Corporation |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:08 UTC |
Hibernate Object/Relational Mapping (ORM)
|
Hibernate |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/30/2024 at 16:19:57 UTC |
Horos
|
Horos Project |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:08 UTC |
Hudson Lock Key Trail
|
Hudson Lock, LLC |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:08 UTC |
IceWarp Server
|
IceWarp, Inc. |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/30/2024 at 16:19:28 UTC |
iDashboards Enterprise Reporting
|
TruOI |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:09 UTC |
ILOG CPLEX Optimization Studio
|
International Business Machines (IBM) |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/30/2024 at 16:19:28 UTC |
imagePROGRAF Direct Print & Share
|
Canon |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/30/2024 at 16:19:29 UTC |
imagePROGRAF Media Configuration Tool
|
Canon |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/30/2024 at 16:19:26 UTC |
Insert - Drupal Module
|
Drupal |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:09 UTC |
InstallShield
|
Revenera |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:03 UTC |
Integrative Genomics Viewer (IGV)
|
Broad Institute |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:09 UTC |
IntelliSpace Radiology
|
Philips |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/12/2024 at 15:25:14 UTC |
International Business Machines (IBM) Partner Engagement Manager (PEM)
|
International Business Machines (IBM) |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:09 UTC |
International Business Machines (IBM) Sterling Business-to-Business (B2B) Integrator
|
International Business Machines (IBM) |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:10 UTC |
IO Ping
|
Linux Foundation |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/27/2024 at 15:30:19 UTC |
Jamf Pro
|
JamF |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/27/2024 at 15:29:22 UTC |
JTB FlexReport
|
JTB World |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/13/2024 at 13:28:45 UTC |
Justinmind Prototyper
|
Justinmind |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/27/2024 at 15:30:47 UTC |
Keysight Tool Ix Automated Network Validation LIbrary (ANVL)
|
Keysight Technologies |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/12/2024 at 15:25:18 UTC |
Keysight Tool Ixload
|
Keysight Technologies |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/16/2024 at 18:06:45 UTC |
KubeCost
|
KubeCost |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/01/2024 at 15:53:41 UTC |
Laerdal Learning Application (LLEAP) Software
|
Laerdal |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/12/2024 at 15:25:17 UTC |
Laurel Bridge Compass
|
Laurel Bridge Software |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:17 UTC |
Liquibase
|
LiquiBase |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/13/2024 at 13:28:44 UTC |
Live Accordion
|
Mandeeps |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:17 UTC |
Live Articles
|
Mandeeps |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:17 UTC |
Live Campaign
|
Mandeeps |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:16 UTC |
Live Compliance
|
Mandeeps |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/27/2024 at 15:33:30 UTC |
Live Content
|
Mandeeps |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/27/2024 at 15:33:19 UTC |
Live Dashboard
|
Mandeeps |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/27/2024 at 15:33:08 UTC |
Live Forms
|
Mandeeps |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/27/2024 at 15:32:58 UTC |
Live Helpdesk
|
Mandeeps |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/27/2024 at 15:32:47 UTC |
Live HyperText Markup Language (HTML)
|
Mandeeps |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/27/2024 at 15:32:33 UTC |
Live Images
|
Mandeeps |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/27/2024 at 15:32:21 UTC |
Live Knowledgebase
|
Mandeeps |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/27/2024 at 15:32:11 UTC |
Live Signature
|
Mandeeps |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/27/2024 at 15:32:00 UTC |
Live Slider
|
Mandeeps |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/27/2024 at 15:31:49 UTC |
Live Visualizer
|
Mandeeps |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/27/2024 at 15:31:26 UTC |
Log Parser Studio
|
Microsoft |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/27/2024 at 15:31:04 UTC |
Logitech Gaming Software
|
Logitech |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/29/2024 at 15:54:42 UTC |
Mach7 eUnity Enterprise Viewer
|
Mach7 Technologies |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/27/2024 at 02:02:48 UTC |
Mapping Applications for Response, Planning, and Local Operational Tasks (MARPLOT)
|
National Oceanic and Atmospheric Administration (NOAA) |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:05 UTC |
Maria Database (MariaDB) Server
|
MariaDB |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/02/2024 at 19:01:13 UTC |
MasterKing Program
|
Hudson Lock, LLC |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/29/2024 at 15:54:43 UTC |
Medeco XT Web Manager
|
Medeco |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/29/2024 at 15:55:00 UTC |
MediaLab
|
Empirisoft |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/29/2024 at 15:54:45 UTC |
Medicor Imaging Picture Archiving and Communication System (MiPACS) Dental Enterprise Viewer
|
Medicor Imaging |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:16 UTC |
Medicor Imaging Picture Archiving and Communication System (MiPACS) Storage Server
|
Medicor Imaging |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:16 UTC |
MedRx Avant Audiometry
|
MedRx, Inc. |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:05 UTC |
MedRx Studio
|
MedRx, Inc. |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/29/2024 at 15:55:04 UTC |
Metabolic
|
ADInstruments |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:16 UTC |
Microsoft ASP.NET Razor
|
ASP.NET |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/26/2024 at 15:09:17 UTC |
Microsoft Debug Diagnostic Tool
|
Microsoft |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:16 UTC |
Microsoft Plug-in Registration Tool
|
Microsoft |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/29/2024 at 15:54:47 UTC |
Microsoft Power Business Intelligence (BI) Report Builder
|
Microsoft |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/14/2024 at 18:01:43 UTC |
MindWare Electrodermal Activity (EDA) Analysis
|
Mindware Technologies LTD |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/30/2024 at 15:42:03 UTC |
Mine Safety Appliances (MSA) Link Software
|
Mine Safety Appliances (MSA) |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/13/2024 at 13:28:45 UTC |
Mirada DBx
|
Mirada Medical USA, Inc |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/27/2024 at 15:29:51 UTC |
Momentum
|
CGI |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/29/2024 at 15:54:39 UTC |
MOVEit Automation
|
Progress |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/27/2024 at 02:03:09 UTC |
MPLAB X Integrated Development Environment (IDE)
|
Microchip Technologies, Inc. |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/12/2024 at 15:25:17 UTC |
MUSE Cardiology Information System
|
GE Healthcare |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/01/2024 at 15:53:42 UTC |
My Structured Query Language (MySQL) Database - Commercial Editions
|
Oracle |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/06/2024 at 18:46:15 UTC |
Net Health Employee Health and Occupational Medicine
|
Net Health |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/29/2024 at 15:54:37 UTC |
NetSpot
|
Netspot |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/16/2024 at 18:06:54 UTC |
NewTek Virtual Set Editor
|
NewTek |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/27/2024 at 02:02:45 UTC |
Nintex Robotic Process Automation (RPA)
|
Nintex |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/27/2024 at 02:03:25 UTC |
Nlyte Asset Optimizer (NAO)
|
Nlyte |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/16/2024 at 18:06:51 UTC |
Nlyte Energy Optimizer (NEO)
|
Nlyte |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/06/2024 at 18:47:13 UTC |
Node Version Manager (NVM) for Windows
|
Corey Butler |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/19/2024 at 14:48:02 UTC |
North52 Business Process Activities (BPA)
|
North52 |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:15 UTC |
NUnit
|
NUnit.org |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:15 UTC |
OBSBOT Center
|
OBSBOT |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/12/2024 at 15:25:15 UTC |
Oce Publisher Select
|
Canon |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/19/2024 at 14:47:48 UTC |
Olympus Sonority
|
Olympus |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:05 UTC |
Patient Hub
|
Medical Reporting Software Systems, Inc. |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:15 UTC |
Pega Infinity Suite
|
Pegasystems |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:15 UTC |
Photon Server
|
Exit Games, Inc. |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/27/2024 at 02:03:06 UTC |
PingPlotter
|
PingPlotter |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/27/2024 at 15:31:15 UTC |
PMD
|
PMD |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/01/2024 at 15:53:42 UTC |
Pmetrics
|
Laboratory of Applied Pharmacokinetics and Bioinformatics |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:15 UTC |
Power Global Regular Expression Print (PowerGREP)
|
Just Great Software |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:15 UTC |
Power Pivot for Microsoft Excel
|
Microsoft |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:15 UTC |
PowerPoint vote (ppvote)
|
Clikapad |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/27/2024 at 15:34:05 UTC |
Pressure Volume (PV) Loop
|
ADInstruments |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:14 UTC |
PsyCalc
|
Linric Company |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:14 UTC |
Public Health Information Network (PHIN) Messaging Guide for Syndromic Surveillance
|
Centers for Disease Control and Prevention |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/19/2024 at 14:47:19 UTC |
Publish or Perish
|
Harzing |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:13 UTC |
Python Poetry
|
Python Poetry |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/29/2024 at 15:54:38 UTC |
Q-SYS Designer Software
|
QSC |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/27/2024 at 15:28:17 UTC |
Rainmeter
|
Rainmeter |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/27/2024 at 15:34:21 UTC |
Red Hat Enterprise Linux (RHEL)
|
Red Hat |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/27/2024 at 15:28:46 UTC |
Redux Dev tool
|
Meta |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/29/2024 at 15:54:58 UTC |
Registrar Registry Manager
|
Resplendence |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/27/2024 at 15:34:38 UTC |
Remote Automated Laboratory System (RALS) Remote Connect
|
Abbott |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/27/2024 at 02:03:04 UTC |
Remote Process Explorer
|
LizardSystems |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/27/2024 at 15:33:41 UTC |
RescueNet EventSummary
|
Zoll |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/30/2024 at 16:19:25 UTC |
Revo Uninstaller Pro
|
VS Revo Group |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/29/2024 at 15:54:44 UTC |
Rimage QuickDisc
|
Rimage |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/27/2024 at 15:33:52 UTC |
Rimage System Manager
|
Rimage |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:05 UTC |
Robotic Automation Runtime (WorkForce Intelligence and Robotics)
|
Pegasystems |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/29/2024 at 15:54:59 UTC |
Rsyslog
|
Adiscon |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/15/2024 at 17:13:07 UTC |
SaTScan
|
SaTScan |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:13 UTC |
ScienceLogic SL1
|
ScienceLogic |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/15/2024 at 17:13:04 UTC |
SEER 1000 Software
|
GE Healthcare |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/29/2024 at 15:54:59 UTC |
Selenium-Standalone
|
Vincent Voyer |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:13 UTC |
SendSuite Live
|
Pitney Bowes |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/29/2024 at 15:54:53 UTC |
Sentinel Visualizer
|
FMS |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:12 UTC |
Service Operations Insight
|
Broadcom |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:06 UTC |
Shadow Communications Management Software (CMS) All-In-One Analytics
|
RSI |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:12 UTC |
Sharp Pen Software
|
Sharp |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:11 UTC |
Sharpdesk
|
Sharp |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/30/2024 at 16:19:29 UTC |
Sierra Summit
|
Cadwell Industries |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/27/2024 at 02:03:00 UTC |
SimpleK Master Keying and Key Management
|
Prosystech |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/01/2024 at 15:53:39 UTC |
Simplify3D
|
Simplify3D |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:11 UTC |
SizeExplorer Pro
|
JSD Software |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/27/2024 at 15:30:32 UTC |
SketchUp
|
Trimble |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/27/2024 at 02:03:23 UTC |
SmartCOMM
|
Smart Communications |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:10 UTC |
SoapUI
|
SmartBear Software |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:10 UTC |
Softclient
|
Zenitel |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:10 UTC |
SpecsIntact
|
NASA |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:10 UTC |
Split View Software
|
Split View Software |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/29/2024 at 15:54:57 UTC |
Strawberry Perl
|
StrawberryPerl |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/27/2024 at 02:03:02 UTC |
Studio 3T
|
StudyTRAX LLC. |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/16/2024 at 18:06:51 UTC |
Sublime Text
|
Sublime HQ |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/28/2024 at 17:43:10 UTC |
SunCheck Machine
|
Sun Nuclear Corporation |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/07/2024 at 15:52:38 UTC |
SunCheck Patient
|
Sun Nuclear Corporation |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/07/2024 at 15:52:39 UTC |
Symbia.net Clinical Workflow Server
|
Siemens Healthcare |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/01/2024 at 15:53:43 UTC |
Tableau Desktop
|
Tableau Software |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/06/2024 at 18:47:23 UTC |
Talend Data Fabric
|
QlikTech |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/27/2024 at 15:27:30 UTC |
Telerik Test Studio
|
Telerik |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/15/2024 at 17:13:08 UTC |
TidyTabs
|
Nurgo Software |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/27/2024 at 15:29:35 UTC |
TigerConnect
|
Tiger Connect |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/29/2024 at 15:55:00 UTC |
Tool for Oracle Application Developers (TOAD) Intelligence Central
|
Quest |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/29/2024 at 15:54:52 UTC |
TrakaWEB
|
Traka |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/29/2024 at 15:54:47 UTC |
Trellix Command Line Scanner
|
Trellix |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/01/2024 at 15:53:40 UTC |
TSSadmin Express
|
Access Solutions Inc |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/29/2024 at 15:54:48 UTC |
UiPATH
|
UiPATH |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/12/2024 at 15:25:18 UTC |
UltraEdit
|
IDM Computer Solutions, Inc. |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/27/2024 at 02:02:40 UTC |
Uniform Resource Locator (URL) Rewrite
|
Microsoft |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/30/2024 at 16:19:25 UTC |
UnityConnect
|
Bio-Rad Laboratories |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/29/2024 at 15:54:53 UTC |
Universal Public Health Node (UPHN) Lite
|
New York State Department of Health |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/29/2024 at 15:54:42 UTC |
UVProbe
|
Shimadzu |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/29/2024 at 15:54:52 UTC |
VendMAX
|
Crane Payment Innovations |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/29/2024 at 15:54:48 UTC |
Vim
|
VIM Community |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/29/2024 at 15:54:45 UTC |
Visual Studio (VS) Code
|
Microsoft |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/19/2024 at 14:47:04 UTC |
VMware Photon Operating System (OS)
|
VMware |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/27/2024 at 02:02:46 UTC |
Vocera Analytics
|
Stryker |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/07/2024 at 15:52:39 UTC |
Voronoi Health Analytics Data Analysis Facilitation Suite (DAFS)
|
Voronoi Health Analytics |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/27/2024 at 02:02:57 UTC |
Wacom Bamboo Driver
|
Wacom |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/30/2024 at 16:19:26 UTC |
Windows Communication Foundation (WCF) Data Services
|
Microsoft |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/29/2024 at 15:54:53 UTC |
Wireless Information System for Emergency Responders (WISER)
|
National Institutes of Health - US National Laboratory of Medicine |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/29/2024 at 15:54:54 UTC |
Word Barcode Add-In
|
OnBarcode |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/29/2024 at 15:54:57 UTC |
X1 Search
|
X1 Discovery, Inc |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/29/2024 at 15:54:51 UTC |
Xcode
|
Apple |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/12/2024 at 15:25:18 UTC |
XenData Server
|
XenData |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/29/2024 at 15:54:54 UTC |
Z5
|
ZVRS |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/29/2024 at 15:54:54 UTC |
Zotero Connector
|
Roy Rosenzweig Center for History and New Media |
TRM Mgmt Group |
One-VA TRM v24.8 |
08/26/2024 at 15:09:17 UTC |
3CX Phone System
|
3CX |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/25/2024 at 14:43:04 UTC |
AbacusLaw
|
Abacus Data Systems, Inc. |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/03/2024 at 19:33:59 UTC |
Accessaphone
|
Tenacity Operating, LLC. |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/25/2024 at 14:43:01 UTC |
AccessRx Med Manager
|
TouchPoint Medical |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/29/2024 at 14:48:40 UTC |
Accu-Chek 360 Diabetes Management System
|
Roche Diagnostics |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/31/2024 at 16:43:47 UTC |
AcqKnowledge for Stellar Telemetry
|
BIOPAC Systems, Inc |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/19/2024 at 16:33:59 UTC |
Active Navigation
|
ActiveNavigation |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/15/2024 at 19:06:05 UTC |
ActivID Desktop Validation Client
|
HID Global |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/01/2024 at 14:13:55 UTC |
Acuo Vendor Neutral Archive (VNA)
|
Hyland Healthcare |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/19/2024 at 02:55:00 UTC |
Advantage Plus Reprocessor LIO Software
|
Steris |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/29/2024 at 14:48:42 UTC |
Agisoft Metashape
|
Agisoft |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/15/2024 at 19:06:05 UTC |
Alaris System Maintenance Software
|
Becton, Dickinson and Company |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/19/2024 at 16:33:56 UTC |
Alertus Desktop
|
Alertus Unified Facility Notification |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/15/2024 at 19:06:05 UTC |
Alertus Server
|
Alertus Unified Facility Notification |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/31/2024 at 16:43:49 UTC |
Alfresco Community Edition
|
Alfresco |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/19/2024 at 16:34:03 UTC |
AlinIQ Inventory Manager Software (IMS)
|
Abbott |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/24/2024 at 04:25:09 UTC |
ALOHA (Areal Locations of Hazardous Atmospheres)
|
National Oceanic and Atmospheric Administration (NOAA) |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/15/2024 at 19:06:05 UTC |
Alteryx Designer
|
Alteryx |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/19/2024 at 02:54:52 UTC |
Amazon Appstream 2.0 Client
|
Amazon Web Services |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/15/2024 at 19:06:06 UTC |
Amazon Web Service (AWS) Session Manager plugin
|
Amazon Web Services |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/12/2024 at 02:56:04 UTC |
Amazon Web Services (AWS) Software Development Kit (SDK) for JavaScript
|
Amazon Web Services |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/01/2024 at 19:39:37 UTC |
Analyze in Excel
|
Microsoft |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/01/2024 at 15:53:05 UTC |
Ant Renamer
|
Antoine Potten |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/25/2024 at 14:43:01 UTC |
Apache Lucene.Net
|
Apache Software Foundation (ASF) |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/24/2024 at 04:25:02 UTC |
Apache Multipurpose Infrastructure for Network Applications (MINA)
|
Apache Software Foundation (ASF) |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/24/2024 at 04:25:09 UTC |
APC Advanced View
|
APC |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/15/2024 at 19:06:15 UTC |
Appium
|
Appium |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/19/2024 at 02:54:54 UTC |
Applicability Statement for Secure Health Transport (Direct)
|
Direct Trust |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/19/2024 at 02:54:53 UTC |
Application Request Routing (ARR)
|
Microsoft |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/19/2024 at 02:54:50 UTC |
Arc Geographic Information System (ArcGIS) Survey 123 Connect
|
Esri |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/30/2024 at 16:02:06 UTC |
Assign Sequencing Based Typing (SBT)
|
CareDx Inc. |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/19/2024 at 16:34:04 UTC |
Attachment Save
|
Sperry Software |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/15/2024 at 19:06:14 UTC |
AutoCAD LT
|
Autodesk, Inc. |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/01/2024 at 14:13:57 UTC |
AutoCue QPro Prompting Software
|
Videndum |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/31/2024 at 16:43:49 UTC |
Autodesk Navisworks Exporters
|
Autodesk, Inc. |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/19/2024 at 02:54:56 UTC |
Autodesk Vault
|
Autodesk, Inc. |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/01/2024 at 14:13:56 UTC |
Automated Acquisition Management Solution (AAMS)
|
Distributed Solutions, Inc. |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/19/2024 at 16:34:05 UTC |
Automated Cost Estimating Integrated Tools (ACEIT)
|
Tecolote Research, Inc. |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/15/2024 at 19:06:15 UTC |
Automation Station
|
Lentech, Inc |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/19/2024 at 02:54:55 UTC |
Avaya Workforce Engagement
|
Avaya |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/30/2024 at 16:02:08 UTC |
AxisTV Conference
|
Visix, Inc. |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/25/2024 at 14:43:04 UTC |
AzureSpot Pro
|
Azure BioSystems |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/19/2024 at 16:33:57 UTC |
Becton and Dickinson (BD) FACSuite Clinical Application
|
Becton, Dickinson and Company |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/29/2024 at 14:48:42 UTC |
Benjamin Rose Institute on Aging (BRI) Care Consultation Information System (CCIS)
|
Benjamin Rose Institute on Aging (BRI) |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/01/2024 at 15:53:21 UTC |
BindIt Software
|
Thermo Fisher Scientific Inc. |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/15/2024 at 19:06:13 UTC |
BioTek Gen5
|
Agilent Technologies |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/24/2024 at 04:25:10 UTC |
Bitcentral Central Control
|
Bitcentral |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/16/2024 at 16:21:35 UTC |
Blackmagic Design ATEM Switcher Software
|
Blackmagic Design |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/15/2024 at 19:06:14 UTC |
BlueJeans Desktop Application
|
Verizon |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/25/2024 at 14:43:02 UTC |
Boston Scientific Simplicit90Y
|
Boston Scientific |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/31/2024 at 16:43:49 UTC |
Brady Workstation
|
Brady Corporation |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/12/2024 at 02:56:00 UTC |
BrainVisa
|
BrainVisa Group |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/01/2024 at 19:39:31 UTC |
Bucher + Suter (B + S) Connects for Microsoft Dynamics
|
Bucher + Suter |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/10/2024 at 12:15:39 UTC |
CA Business Service Insight (BSI)
|
Broadcom |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/15/2024 at 19:06:13 UTC |
Canvas Learning Management System (LMS)
|
Instructure |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/16/2024 at 18:26:15 UTC |
Cartegraph Asset Management
|
OpenGov Cloud |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/29/2024 at 14:48:43 UTC |
Centrak BACNet Connector
|
CenTrak |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/19/2024 at 16:34:05 UTC |
Centricity Perioperative
|
GE Healthcare |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/29/2024 at 14:48:45 UTC |
Ceph
|
Ceph Foundation |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/15/2024 at 19:06:13 UTC |
Cerner Multum addVantageRx Software Development Kit (SDK)
|
Oracle |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/29/2024 at 14:48:46 UTC |
CET Commercial Interiors
|
Configura |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/10/2024 at 12:15:37 UTC |
Cewolf
|
Cewolf |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/25/2024 at 14:43:04 UTC |
Chef-solo
|
Chef |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/19/2024 at 16:33:52 UTC |
Chest Imaging Platform (CIP)
|
Brigham and Women`s Hospital (BWH) |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/29/2024 at 14:48:43 UTC |
Chyron LyricX
|
Chyron Hego |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/15/2024 at 19:06:14 UTC |
Cisco Unified Customer Voice Portal (CVP)
|
Cisco Systems, Inc |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/03/2024 at 19:34:00 UTC |
Cisco Virtual Internet Routing Lab (VIRL)
|
Cisco Systems, Inc |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/15/2024 at 19:06:13 UTC |
ClearOne Dialog 20 2-Channel Wireless Microphone System Software
|
Clearone |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/15/2024 at 19:06:14 UTC |
Code On Time
|
Code On Time |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/15/2024 at 19:06:14 UTC |
Codename: The Bridge
|
MI7 |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/29/2024 at 14:48:43 UTC |
Comma-Separated Values (CSV) Format
|
Internet Engineering Task Force (IETF) |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/15/2024 at 19:50:15 UTC |
CommCell Console
|
CommVault Systems |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/15/2024 at 19:06:13 UTC |
Communicator EXT
|
Electro Industries/ Gauge Tech |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/19/2024 at 16:33:42 UTC |
Composite Health Care System (CHCS)
|
Military Health System |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/03/2024 at 19:34:04 UTC |
Computer-Aided Management of Emergency Operations (CAMEO) Chemicals
|
National Oceanic and Atmospheric Administration (NOAA) |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/15/2024 at 19:06:14 UTC |
Computer-Aided Management of Emergency Operations (CAMEO) Data Manager
|
National Oceanic and Atmospheric Administration (NOAA) |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/01/2024 at 14:13:51 UTC |
Confluence
|
Atlassian Software Systems |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/01/2024 at 14:13:58 UTC |
Connectome Workbench
|
Washington University School of Medicine |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/01/2024 at 19:39:37 UTC |
containerd
|
Linux Foundation |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/19/2024 at 16:33:44 UTC |
CrypTool
|
The CrypTool Project |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/24/2024 at 04:25:11 UTC |
Cubase
|
Steinberg |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/25/2024 at 14:43:04 UTC |
Current Procedural Terminology (CPT)
|
AMA |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/19/2024 at 02:55:01 UTC |
Custom Portable Document Format (PDF) Writer
|
Acro Software |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/15/2024 at 19:06:12 UTC |
Cyberduck
|
Iterate GmbH |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/12/2024 at 02:55:56 UTC |
Day-of-Care
|
Advarra |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/19/2024 at 16:34:04 UTC |
Dell Command Update
|
Dell |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/02/2024 at 20:03:30 UTC |
Dell Power Manager (DPM)
|
Dell |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/31/2024 at 16:43:47 UTC |
DisplayLink
|
Synaptics |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/25/2024 at 14:42:57 UTC |
Distributed Network Architecture (DNA) Fusion
|
Open Options |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/02/2024 at 20:03:28 UTC |
Document Storage System (DSS) Encoder Product Suite (EPS)
|
Document Storage Systems, Inc (DSS) |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/24/2024 at 04:25:11 UTC |
Drafting Assistant
|
Thomson Reuters |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/29/2024 at 14:48:45 UTC |
DS Storage Manager
|
International Business Machines (IBM) |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/24/2024 at 04:25:12 UTC |
DYMO Connect for Desktop
|
DYMO |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/16/2024 at 18:26:13 UTC |
eCase Human Resources (HR) Employee Relations/Labor Relations (ER/LR)
|
AINS |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/16/2024 at 18:26:15 UTC |
Eclipse Integrated Development Environment (IDE)
|
Eclipse |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/17/2024 at 16:03:14 UTC |
EcoStruxure Building Operation
|
Schneider Electric |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/19/2024 at 16:33:44 UTC |
EditPlus
|
Editplus |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/02/2024 at 20:03:30 UTC |
eG Enterprise
|
eG Innovations |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/25/2024 at 14:43:05 UTC |
EndoVault Electronic Health Record (EHR)
|
EndoSoft |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/17/2024 at 16:03:15 UTC |
Enercalc Structural Engineering Plan Check Edition
|
ENERCALC, INC |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/16/2024 at 18:26:15 UTC |
Enterprise Connect
|
Apple |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/16/2024 at 18:26:16 UTC |
Ephesoft Transact
|
Ephesoft |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/30/2024 at 16:02:06 UTC |
EV for Physicians
|
T System |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/01/2024 at 19:39:36 UTC |
ExtraView
|
ExtraView Corporation |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/10/2024 at 12:15:39 UTC |
Fast Dump Restore Compaktor (FDRCPK)
|
BMC Software |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/19/2024 at 16:33:45 UTC |
FastReport Visual Component Library (VCL)
|
Fast Reports Inc. |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/01/2024 at 19:39:37 UTC |
FDA eSubmitter
|
FDA |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/15/2024 at 19:06:11 UTC |
FileMaker Pro
|
Claris |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/25/2024 at 14:42:59 UTC |
FileOpen Client Plug-In for Adobe Acrobat/Reader
|
FileOpen Systems |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/01/2024 at 15:53:06 UTC |
FireControl
|
Langmuir Systems |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/19/2024 at 16:33:45 UTC |
FIREHOUSE Software
|
FIREHOUSE Software |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/01/2024 at 15:53:07 UTC |
FITFOOT360
|
FIT360 Ltd |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/24/2024 at 04:25:12 UTC |
FlexSet Internet Protocol (FlexIP) Softphone (FLIPS)
|
Tadiran Telecom |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/15/2024 at 19:06:14 UTC |
Fluke Power Analyze Software
|
Fluke |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/01/2024 at 19:39:32 UTC |
FMRIB Software Library (FSL)
|
FMRIB Analysis Group |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/01/2024 at 15:53:07 UTC |
FreeFlow Variable Information (VI) Design Professional
|
Xerox |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/19/2024 at 16:33:45 UTC |
Freeflow Variable Input (VI) eCompose
|
Xerox |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/10/2024 at 12:15:38 UTC |
FreeSWITCH
|
SignalWire |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/01/2024 at 19:39:33 UTC |
Freezerworks Sample Management Software
|
Dataworks Development Inc. |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/17/2024 at 16:03:16 UTC |
Gen3 client
|
Gen3 Data Commons |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/15/2024 at 19:06:15 UTC |
GeoRover Locus Track
|
Leidos |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/25/2024 at 14:43:03 UTC |
Gimmal Physical
|
Sanford Federal |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/12/2024 at 02:55:57 UTC |
GoAnywhere Managed File Transfer (MFT)
|
Go Anywhere |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/16/2024 at 18:26:17 UTC |
Google Earth
|
Google |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/01/2024 at 14:13:52 UTC |
Gradle
|
Gradle Inc. |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/24/2024 at 04:25:13 UTC |
GraphicsMagick
|
GraphicsMagick |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/16/2024 at 18:26:17 UTC |
Green’s Advanced Interpretation (AI) Program
|
Green's Publishing |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/01/2024 at 19:39:38 UTC |
grepWin
|
Stefan Kung |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/19/2024 at 16:34:04 UTC |
HAIVision Helper
|
Haivision |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/30/2024 at 16:02:07 UTC |
HCL BigFix
|
HCL Technologies, Limited |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/10/2024 at 19:17:22 UTC |
Health Level 7 (HL7) Application Programming Interface (API) (HAPI)- Fast Healthcare Interoperable Resources (FHIR)
|
James Agnew |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/01/2024 at 14:13:57 UTC |
Heidelberg Eye Explorer (HEYEX)
|
Heidelberg Engineering, Inc. |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/30/2024 at 16:02:08 UTC |
Hewlett Packard (HP) Smart
|
Hewlett Packard Enterprise |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/19/2024 at 02:54:51 UTC |
Hewlett Packard Enterprise Integrated Lights-Out (HPE iLO) Integrated Remote Console
|
HP |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/19/2024 at 02:54:59 UTC |
HistoView
|
Meyer Instruments |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/03/2024 at 19:34:10 UTC |
Hitachi Data Protection Suite
|
Hitachi |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/16/2024 at 18:26:17 UTC |
Honeywell PrintSet
|
Honeywell |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/20/2024 at 01:42:30 UTC |
Host Integration Tool for Linux (HIT/Linux)
|
Dell |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/01/2024 at 15:53:07 UTC |
Hourly Analysis Program (HAP)
|
Carrier United Technology |
TRM Mgmt Group |
One-VA TRM v24.7 |
07/10/2024 at 12:15:40 UTC |
HPE OneView
|
HPE |
|